Comprehensive conceptual design package, inclusive of design and performance presentation materials. Additionally, provision of shipyard tendering packages and support services, focusing on purpose-driven designs, solutions that augment vessel performance, as well as commitment to dedication and prompt responsiveness
Basic design services encompassing a basic design package along with project management, supervision, and subsequent follow-up. Additionally, offering a data and document management toolbox, emphasizing early construction initiation, active involvement, influential contributions, and providing the necessary attitude and tools for efficient cooperation
In a feasibility study, several key aspects are typically addressed:
Solutions and Impact Analysis: The study will offer potential solutions for battery applications and provide estimates of their effects on ship performance. Pellica marine conducts thorough analyses across various operational parameters from a multi-disciplinary standpoint to optimize the vessel and operator's energy storage and consumption strategies.
Opportunities and Challenges: There are numerous opportunities and challenges associated with integrating a Battery Energy Storage System (BESS) within a power system. The study aims to identify and quantify operational benefits (such as fuel efficiency) and enhanced safety levels.
Hybrid Feasibility Report Process: As part of Pellica marine advisory, they produce a hybrid feasibility report by following these steps: